April 23, 2015

Our Little Library

 
 

Yes! You can still check out books!

A portion of our collection will remain on-site during construction for check-out by students and patrons.

Open Space

 
 

April 22, 2015

Empty Shelves

Today, the maintenance crew finished moving the boxes of books out of the library and into the storage room. Not all of the books have been put into storage. A small collection of the library’s newer and more frequently used books is located in what was formerly the library’s workroom. Patrons will have free access to those books during the renovation process.


When I look at the empty shelves in the library, I get one of two sensations. Either I get a feeling of expectancy, as if they are ready and waiting to be filled, or a feeling of emptiness and loss, as if the library has become a ghost town. The actuality is neither of these. They are a stage of the transition process from the old to the new. Within the next few weeks, the shelving units will be dismantled and bundled into storage bins in preparation for construction scheduled to begin late in June. If all goes as planned, they will be resurrected in about a year’s time as part of the new library.

"H" Building Circa 1973

There were so few buildings in the 70's, for identification they were lettered not named. Hence, "H" building.

Click HERE to see more of what the campus looked like in 1973.

April 21, 2015

Butler County Community College Circa 1973

While cleaning the media room, the staff found a carousel filled with slides titled Butler County Community College Learning Resources Center. 

Click HERE to see what the college looked like in 1973.

April 14, 2015

25th Anniversary Quilt (1/4)

During the renovation, the 25th Anniversary Quilt that was hanging in the library will be stored. Here are photographs of the squares and the original descriptions.